Considering building a backyard cottage for income or converting your basement into a mother-in-law suite for the family? You are not alone! Constructing an Accessory Dwelling Unit (ADU) is one of the best ways that Seattle residents can make sure that their property value is maximized while providing much-needed housing for the city.
However, obtaining an ADU permit is not always easy. In light of the historic statewide zoning reforms, Seattle has become one of the most innovative ADU build cities in the nation. Although the outdated zoning rules have relaxed somewhat, it is important to know how to get through the SDCI maze. Here is our ADU Permit Process Guide for Seattle.
The New Rules: Building Permitted in Seattle
Thanks to new rules and regulations, the process of constructing an ADU in Seattle has become drastically different from what it used to be. Here’s what you can do in an NR zoned area:
- Up to Two ADUs: It is possible to construct up to two accessory units on one plot of land. You can build two DADUs (backyard cottages), two AADUs (basement apartments), or one of each.
- No Owner-Occupancy Provisions: You will no longer be required to occupy any of your properties yourself as you can freely use both your main house and your ADUs for rental purposes.
- No Parking Space Required: You won’t need to provide a parking spot that is not connected with a public road.
- Size and Limitations: Rather than having a fixed square footage limit on all units, their size is limited by lot coverage and FAR (floor area ratio) of the whole property. DADUs typically have a maximum size of 1,000 sq ft.
Step-By-Step Guide To The Seattle ADU Permit Process
Applying for your ADU permit calls for strategic planning. Being the one-stop shop that Innate is through our single-roof Design Build concept, we do this multi-tiered process simultaneously in order to circumvent the delay involved with traditional construction.
1. Site Feasibility and Zoning Preparation: Weeks 1-2
We gather information from your property before any concepts are even drawn up to examine your setbacks (normally 5 feet for sides and rear), your utilities and possible Environmentally Critical Area (ECA), such as steep slopes or wetlands.
2. Development of the ADU Build Plans: Weeks 3-8
We design bespoke building plans for your ADU, based on your unique property’s light and aesthetics. Or, if time is of the essence, we can use Seattle's Pre-Approved Standard Plans library.
3. The Pre-Application & Portal Submission: Week 9
Innate submits the Construction & Land Use Pre-Application using the Seattle Services Portal. This creates your official project file, informs King County of any mandatory sewer treatment capacity certifications, and creates your SDCI intake date.
4. SDCI Plan Review & Correction: Weeks 10-16
The SDCI will review the Structural Engineering Plans, Energy Code Compliance Plans, and Stormwater Management Plans. Should there be any corrections issued by the city, they will be addressed immediately by our combined in-house engineering and architecture departments, without the finger pointing that happens between independent firms.
5. Permits & Mobilization: Final Stage
As soon as the permits for construction, electrical, mechanical and plumbing are issued, construction can start. This is because at Innate, we abide by an absolute policy of never swinging a hammer until all fixtures and materials are ordered.

DADU vs. AADU Permitting: A Quick Comparison
In determining whether or not to build into your existing structure, you need to consider the permitting challenges that come with either a DADU or an AADU project.
Attached Accessory Dwelling Units (AADUs)
- Typical AADU Designs: Basement conversion, attic conversion, or home addition.
- Permitting Process: It is processed as a construction addition / alteration permit.
- Challenges: The municipality pays a lot of attention to building code in an existing structure. You must adhere to certain ceiling height requirements and install proper fire separation walls and ceilings between both living areas.
- Advantages: It can be more economical and quicker to tie into existing utilities of your house.
Detached Accessory Dwelling Units (DADUs)
- Common Forms: Backyard cottages, carriage houses, or remodeling an existing detached garage.
- Type of Permit: New Construction permit.
- The Tough Issues: Since this is an entirely new construction project, you will need to contend with soil issues, setbacks, individual foundation structures, and trenching utility lines across your property.
- The Benefits: You qualify for Seattle's pre-approved standard plans process, potentially shaving a couple weeks off the review period of your city.
- Utility Information: You do not necessarily have to establish an independent water and electrical meter for your accessory dwelling unit; however, you must pay a Sewage Treatment Capacity Fee from King County for your added living space during your intake process.
Why Design-Build is Superior to the Old Way
In the conventional process of remodeling, you contract an architect to draw up plans, allow several months for them to be reviewed by a separate engineer who will go through them, forward them to the city for approval, then send them to a contractor—who tells you that your budget is only half of what it actually takes.
At Innate, we constantly monitor the cost of labor and materials in real-time while designing the project for you. Our unique software system, JobSync, allows you to follow all steps of permitting and construction timeline from your mobile device.
By combining architecture, engineering, permits, and construction into one company, we eliminate many months of inefficiencies in the city's review process.